SOF Connect AD invites all interested parties to submit a bid for the selection of a contractor with a subject: Inspection of blast deflector: “Inspection of the metal structure for damaged or missing bolted connections, inspection and tightening of all bolted connections, inspection of zinc coating and correction, where necessary – subscription for a period of 3 (three) years”